Aadal, H., Bagheri Fard, A., Golchin Rad, K., Ghasemi Poor Sabet, P. and Morshedi, S. R. 2014. “Impact of plants and equipment management in construction industry of Iran”. Res. J. Appl. Sci. Eng. Tech., 7(11): 2371-2375.
Amirkhanian, S. N. and Baker, N. J. 1992. “Expert system for equipment selection for earth-moving operations”. J. Constr. Eng. Manag., 118(2): 318-331.
Armaghani, D. J., Mohamad, E. T., Narayanasamy, M. S., Narita, N. and Yagiz, S. 2017. “Development of hybrid intelligent models for predicting TBM penetration rate in hard rock condition”. Tunn. Undergr. Sp Tech., 63: 29-43.
Babpoor, M. 2016. “What is the relationship between artificial intelligence, machine learning and data mining?” https://dataak.com/ blog/what-is-the-difference-between-artificial-intelligence-machine-learning-data-mining/
Biuse, R., Momeni, M. and Hamidizadeh M. R. 2018. “Identifying the most effective factor in the procurement phase of the EPC projects of oil and gas companies using the AHP method”. The Second International Conference and the Fourth Conference of the National Logistics and Supply Chain Conference, Tehran.
Chapman, P., Clinton, J., Kerber, R., Khabaza, T., Reinartz, T., Shearer, C. and Wirth, R. 1999. “The CRISP-DM User Guide”. In 4th CRISP-DM SIG Workshop in Brussels, Vol. 1999.
Dixit, S., Pandey, A. K., Mandal, S. N. and Bansal, S. 2017. “A study of enabling factors affecting construction productivity: Indian scnerio”. Int. J. Civ. Eng. Tech., 8(6): 741-758.
Duffy, G. A. 2009. “Linear scheduling of pipeline construction projects with varying production rates”. Oklahoma State University.
Edwards, D. J. and Holt, G. D. 2000. “ESTIVATE: a model for calculating excavator productivity and output costs”. Eng. Constr. Architect. Manag., 7(1): 52-62.
Eshthardian, A., Noorani, M., Vahidi, H. and Najafabadipour, T. 2012. “Linear programming model to optimize the number of machines with the aim of reducing the time and cost of earthworks in urban projects”. International Conference on Civil Engineering, Architecture and Sustainable Urban Development, Tabriz, Iran.
Esrafili Dizaji, B. and Kiani Harchegani, F. 2011. “Persia land of black gold”. 10.13140/2.1.42 64.0001.
Eskandari, A., Abdi, A. and Eskandari, V. 2014. “Optimization of earthmoving machines by genetic algorithm”. Third International Congress on Civil Engineering, Architecture and Urban Development, Tehran, Iran.
Fallahnejad, M. 2013. “Delay causes in Iran gas pipeline projects”. Int. J. Project Manag. 31: 136-146. 10.1016/j.ijproman.2012.06.003.
Hsiao, W. T., Lin, C. T., Wu, H. T. and Cheng, T. M. 2011. “A hybrid optimization mechanism used to generate truck fleet to perform earthmoving operations”. Road Mater. New Innov. Pavement Eng. https://doi.org/10.1061/ 47634(413)20
Jordan, M. I. and Mitchell, T. M. 2015. “Machine learning: Trends, perspectives, and prospects”. Sci., 349(6245): 255-260.
Karshenas, S. and Feng, X. 1992. “Application of neural networks in earthmoving equipment production estimating”. In: Computing in Civil Engineering and Geographic Information Systems Symposium, pp. 841-847, ASCE.
Kassem, M., Mahamedi, E., Rogage, K., Duffy, K. and Huntingdon, J. 2021. “Measuring and benchmarking the productivity of excavators in infrastructure projects: A deep neural network approach”. Automat. Constr., 124 p., 103532.
Ok, S. C. and Sinha, S. K. 2006. “Construction equipment productivity estimation using artificial neural network model”. Constr. Manag. Econ., 24(10): 1029-1044.
Omran, B. A. and Chen, Q. 2016. “Trend on the implementation of analytical techniques for big data in construction research (2000–2014)”. In: Construction Research Congress 2016, pp. 990- 999.
Oyisi Eskoi, A. H. and Ravanshadnia, M. 2012. “Simulation application in multi-objective optimization of earthworks”. 7th National Congress of Civil Engineering.
Panas, A. and Pantouvakis, J. P. 2010. “Comparative analysis of operational coefficients’ impact on excavation operations”. Eng. Constr. Architec. Manag. 17(5): 461-475.
Parchami Jalal, M., Farsatkar, A. and Forozanfar, Y. 2009. “Operation management of construction machinery”. Publication 449.
Parente, M., Correia, A. G. and Cortez, P. 2016. “A novel integrated optimization system for earthwork tasks”. Transport. Res. Proc., 14: 3601-3610.
Parthasarathy, M. K., Murugasan, R. and Murugesan, K. 2017. “A critical review of factors affecting manpower and equipment productivity in tall building construction projects”. J. Constr. Dev. Countries, 22: 1-18.
Ranjithapriya, R. and Arulselvan, S. 2020. “Study on factors affecting equipment management and its effect on productivity in building construction”. Int. J. Eng. Res. Tech. (IJERT), 9(4): 223-230.
Rashidi, A., Rashidi, H. and Maghiar, M. 2014. “Productivity estimation of bulldozers using generalized linear mixed models”. KSCE J. Civ. Eng., 18(6): 1580-1589.
Rostami, J. 2016. “Performance prediction of hard rock Tunnel Boring Machines (TBMs) in difficult ground”. Tunn. Undergr. Sp. Tech., 57: 173-182.
Salimi, A., Rostami, J., Moormann, C. and Delisio, A. 2016. “Application of non-linear regression analysis and artificial intelligence algorithms for performance prediction of hard rock TBMs”. Tunn. Undergr. Sp. Tech., 58: 236-246.
Shahbazbeigi, M., Lotfian, F. and Rezaei-Rad, A. H. 2014. “Study of effective factors in the selection and productivity of road construction machines, case study: Hamedan-Tehran railway project”. Second Conference on National Construction and Project Management, Tehran.
Sircar, A., Yadav, K., Rayavarapu, K., Bist, N. and Oza, H. 2021. “Application of machine learning and artificial intelligence in oil and gas industry”. Petrol. Res., 6(4): 379-391.
Sweis, R., Moarefi, A., Amiri, M. H., Moarefi, S. and Rawan, S. 2019. “Causes of delay in Iranian oil and gas projects: A root cause analysis”. Int. J. Energ. Sector Manag., 13(3): 630-650.
Thomas, H. R. and Kramer, D. F. 2002. “The manual of construction productivity measurement and perfomance evaluation”. SD-35, Construction Industry Institute (CII), Austin, TX.
Wordmeter. 2024. https://www.worldometers.info /gas/gas-reserves-by-country/